Homeowner's
Preparation Guide
1.
We will need access to your driveway to place our dumpster,
load material and clean up. Please keep driveway clear and
remove cars from garage prior to day of installation.
2.
Please keep small children and animals away from the work area
at all times.
3.
There will be constant hammering for two or more days depending on
the size of your roof, be prepared for the noise!
4.
We will remove and replace any satellite dish as a courtesy to
you, however, we do not have the necessary equipment to reset the signal
for proper reception, and we can not be responsible if your carrier
need be called to take care of this upon completion of the job.
5.
**Please
ensure electrical power is provided outside your home. If
exterior plugs are not available, please run a
heavy duty 3 — PRONG extension cord through a window or door.
6.
For each day of rain, the work on your home will be delayed.
Our crews are instructed not to tear off more shingles than they can replace
in a day.
7.
Nails which fall from the roof will be picked up with a three foot
magnet that we will run around your home. However
a few nails may be hidden in the grass of shrubbery.
8.
If you have vaulted ceilings, nail pops and movement may occur
in the ceiling because of inadequate original construction by the
builder. Unfortunately, nothing can be done about this, and we can
not be responsible should this occur.
9.
All left over material and the dumpster will be removed from
your property as soon as possible after the job is complete, usually
the next business day.
10.
If you have any questions or concerns before, during or after job
completion, please give us a call. |